Skip to content
Production feature

Documents: drawings, instructions and versions in one place

Working with an outdated drawing on the shop floor leads to expensive mistakes. The system links drawings, work instructions and measurement reports to the order and machine, keeps versions and shows the operator only the valid version.

  • German, French, Italian, English
  • QR-bill and CHF
  • Roles and audit log

Archive

PDFs, images and office documents are uploaded and linked to a product, order or machine. When a new version is uploaded the old one moves to the archive; the operator screen opens only the current version.

Viewing CAD files depends on the file type.

Rights and log

Who can access a document is set by role; for example a customer drawing is visible only on the relevant work order. Every upload, version change and download is written to the audit log.

For non-disclosure agreements and intellectual property, legal counsel is consulted.

Your benefits

Link

Order and machine.

How we work

  1. 1

    Clarify the need

    By e-mail we discuss your processes, roles, existing systems and how data is moved, and set the scope in writing.

  2. 2

    Build and connect

    We build the solution around your workflow and connect it to e-mail, calendar, documents and payment.

  3. 3

    Test and launch

    We test every flow with realistic cases, train your team and go live only when it is right.

Swiss-specific points

Customer drawings in Switzerland are often confidential; access is limited by role and work order. Server location and backup terms are presented in writing at quote stage. Instructions can be shown in DE, FR, IT or TR.

Frequently asked questions

Can instructions be kept in several languages?

Yes; language versions of the same instruction are linked and the operator sees their own language.

What is the maximum file size?

The size limit is set at project start; large CAD files are assessed separately.