Skip to content
Tenant and building journey

Move-in and move-out: every step from contract to key handover in one flow

When a tenant changes, skipping steps is easy if contract, condition report, keys, deposit and documents run separately. This flow moves every step along in order and on record.

  • German, French, Italian, English
  • QR-bill and CHF
  • Roles and audit log

Move-in

Contract and documents are prepared and sent to the tenant by e-mail. On move-in day the key handover and condition report are filled in on the phone with photos and sent to both sides as PDF.

Contract texts are your own template.

Move-out

The notice is recorded and a check task is created for the move-out date. At move-out the condition is compared with the entry report; the file closes after deposit and utility results.

Release or deduction of the deposit is management’s decision.

Your benefits

How we work

  1. 1

    Clarify the need

    By e-mail we discuss your processes, roles, existing systems and how data is moved, and set the scope in writing.

  2. 2

    Build and connect

    We build the solution around your workflow and connect it to e-mail, calendar, documents and payment.

  3. 3

    Test and launch

    We test every flow with realistic cases, train your team and go live only when it is right.

Swiss-specific points

In Switzerland the handover protocol (Übergabeprotokoll) is an important document between tenant and management. Templates can be prepared in DE, FR, IT or EN; deposit (Mietzinsdepot) rules are recorded according to your contract.

Frequently asked questions

Can the report be filled in on the phone?

Yes; photos are added and the signed PDF is sent to both sides.

Are move-in and move-out compared?

Yes; the same item list appears side by side in both reports.