BOM
Multi-level.
In mechanical engineering a product consists of hundreds of parts, each with a drawing version. The system links bill of materials, parts, work orders and assembly steps, so a missing part is seen in advance.
The bill of materials is defined on several levels; main assembly, subassembly and single part are linked. When an order is placed, the required parts are compared with stock and purchasing.
Data transfer from CAD is assessed separately by file type.
Assembly steps are shown in order together with the relevant drawing; a completed step is recorded. Before delivery, missing or pending parts appear in one list.
For machinery directive and CE matters, a specialist is consulted.
By e-mail we discuss your processes, roles, existing systems and how data is moved, and set the scope in writing.
We build the solution around your workflow and connect it to e-mail, calendar, documents and payment.
We test every flow with realistic cases, train your team and go live only when it is right.
Swiss machine builders often export and need multilingual documentation. The system prepares assembly instructions and delivery documents in DE, FR, IT, EN or TR; export and customs matters are clarified with a specialist.
Yes; main assembly, subassembly and part levels are linked.
Yes; each machine is recorded with a serial number and its history is traceable.
Production planning: work orders, machine capacity, due dates and delay alerts on one screen. For Swiss manufacturers. Quote by e-mail.
Learn moreDocument management in manufacturing: drawings, work instructions, measurement reports, versions and access. For Swiss manufacturers. Quote by e-mail.
Learn moreProduction costing: material, labour, machine hours and overheads; estimate versus actual comparison and quote price. For Switzerland. Quote by e-mail.
Learn more